Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 4 results ...

Eaton, D (2001) A temporal typology for innovation within the construction industry. Construction Innovation, 1(03), 165–79.

Songer, A D, Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(03), 181–90.

Songer, A D, Diekmann, J E, Rasheed, K-A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(03), 191–207.

Stewart, R A and Mohamed, S (2001) Utilizing the balanced scorecard for IT/IS performance evaluation in construction. Construction Innovation, 1(03), 147–63.